---
title: "Solvane, validation créa du tour 2 : 36 visuels pour le 3 mai"
description: "Examinez les créas du tour 2 de Solvane : 14 formats verticaux et 22 visuels fixes avec textes définitifs. Signez avant le 15 avril pour lancer la diffusion du 3 mai avec Vermilion Works."
canonical: "https://pr-110.preview.formlio.com/fr/documents/sedona-validation-des-creas"
locale: "fr"
type: "document"
lastModified: "2026-11-08"
alternates:
  en: "https://pr-110.preview.formlio.com/documents/sedona-marketing-creative-sign-off.md"
---

# Solvane, validation créa du tour 2 : 36 visuels pour le 3 mai

## Round 2

### Round 2. Sign by April 15.

*Creative sign-off · Solvane*

36 assets. One approval releases the May 3 flight.

- Prepared by: Vermilion Works, Sedona
- Approver: Holly Nakai
- Flight: Starts May 3, 2027

*Unbranded white tube on red sandstone in hard desert sun*

*Vermilion Works*

## What you are approving

### 14 vertical cuts. 22 statics. Final copy.

*What you are approving*

Signing locks the Summer 2027 creative for Meta, TikTok and YouTube Shorts and sends it to trafficking.

**If you sign by Thursday, April 15:** assets traffic April 26. The flight starts Monday, May 3.

**If you sign later:** each working day of delay moves the start one day. After April 23, we lose the Memorial Day ramp, and we'd need to replan $64,000 of planned media with you.

## The work

Key frames from round 2. Full cuts play in the review link. Each frame carries one claim and one hook.

*White tube half buried in fine red sand*

*Swipe of white mineral cream on red sandstone*

*Water beading on a white tube against blue sky*

*White tube on a rust linen towel, seen from above*

*Three white tubes on a stepped sandstone ledge*

*White tube in a niche of a red canyon wall*

## The main change

The idea did not change. The first second did: product in frame by 0.4 seconds, in all 14 cuts.

## Since round 1

### What changed since round 1

Your March 29 comments, all closed. Nothing else moved.

### Cuts re-edited

**9**

New openings on 9 of 14 cuts, from your note on slow first frames.

### Hooks replaced

**3**

The "no white cast" hook replaces three lifestyle openers. It led the February test by 22 percent CTR.

### Claims rewritten

**2**

"Reef-safe" is out. Your counsel approved "reef-friendly formula" and "SPF 40 broad spectrum" on April 2.

## After you sign

### What is fixed, what can still move

Read this before signing. It decides what a later change costs.

### Fixed once you sign

Footage, edits, voiceover, claims and music licenses. A change after sign-off is a new round, quoted at $4,850, and it moves the affected assets by five working days.

### Can still move without a new round

Captions, end-card offer and landing page destination, up to 48 hours before an asset goes live. Send these changes to Wren only.

### What we change without asking

Spend weighting between approved cuts, inside the flight budget. Weak cuts get paused on Tuesdays. We never edit an approved asset without you.

### Who signs

Holly Nakai signs for Solvane. Comments from anyone else need to reach Holly first. One signature, one set of notes.

## Next stage

April 15 to the first read. Dates hold only with a signature on the 15th.

| Task | Start | End | Duration | Label |
| --- | --- | --- | --- | --- |
| Sign-off, Holly Nakai | 2027-04-15 | 2027-04-16 | 5 days | Approve |
| Final exports, captions and platform checks | 2027-04-19 | 2027-04-23 | 5 days | Traffic |
| Assets trafficked in Meta, TikTok and YouTube | 2027-04-26 | 2027-04-30 | 5 days | Traffic |
| Flight live | 2027-05-03 | 2027-05-14 | 5 days | In market |
| First performance read, cut by cut | 2027-05-17 | 2027-05-18 | 5 days | In market |

## How to review

Three steps. About 40 minutes.

### 1. Watch on your phone

Open the link on a phone with sound off. That's how 80 percent of views will happen.

### 2. Check the two claims

Confirm both claims match the wording your counsel approved on April 2.

### 3. Sign, or send one list

Sign below, or send Wren one consolidated list of changes by April 15.

## Sign off

### Sign by Thursday, April 15

Signed: assets traffic April 26 and go live May 3. Not signed: the flight moves one working day per day of delay.

### Prepared by

**Wren Talavera**
Creative Director, Vermilion Works

Sedona, AZ
wren@vermilionworks.com

### For sign-off by

**Holly Nakai**
VP Brand, Solvane Sun Care

Questions go to Wren, same day.

### Sign off round 2

By signing, you approve all 14 cuts, 22 statics and final copy as shown in round 2 for the Summer 2027 flight starting May 3, 2027. Later changes to fixed items are a new round at $4,850. Fees and media budget are unchanged.
