Made with Formlio


Unbranded white tube on red sandstone in hard desert sun


Vermilion Works



Creative sign-off · Solvane



Round 2. Sign by April 15.



36 assets. One approval releases the May 3 flight.

Prepared by

Vermilion Works, Sedona



Approver

Holly Nakai



Flight

Starts May 3, 2027

Unbranded white tube on red sandstone in hard desert sun
What you are approving



14 vertical cuts. 22 statics. Final copy.



Signing locks the Summer 2027 creative for Meta, TikTok and YouTube Shorts and sends it to trafficking.



If you sign by Thursday, April 15: assets traffic April 26. The flight starts Monday, May 3.

If you sign later: each working day of delay moves the start one day. After April 23, we lose the Memorial Day ramp, and we'd need to replan $64,000 of planned media with you.

The work



Key frames from round 2. Full cuts play in the review link. Each frame carries one claim and one hook.



The idea did not change. The first second did: product in frame by 0.4 seconds, in all 14 cuts.
TThhee iiddeeaa ddiidd nnoott cchhaannggee.. TThhee ffiirrsstt sseeccoonndd ddiidd:: pprroodduucctt iinn ffrraammee bbyy 00..44 sseeccoonnddss,, iinn aallll 1144 ccuuttss..

What changed since round 1



Your March 29 comments, all closed. Nothing else moved.



What is fixed, what can still move



Read this before signing. It decides what a later change costs.



Fixed once you sign

Footage, edits, voiceover, claims and music licenses. A change after sign-off is a new round, quoted at $4,850, and it moves the affected assets by five working days.

Can still move without a new round

Captions, end-card offer and landing page destination, up to 48 hours before an asset goes live. Send these changes to Wren only.

What we change without asking

Spend weighting between approved cuts, inside the flight budget. Weak cuts get paused on Tuesdays. We never edit an approved asset without you.

Who signs

Holly Nakai signs for Solvane. Comments from anyone else need to reach Holly first. One signature, one set of notes.

Next stage



April 15 to the first read. Dates hold only with a signature on the 15th.



Approve15 - Apr 16

Sign-off, Holly Nakai



Traffic19 - Apr 23

Final exports, captions and platform checks



Traffic26 - Apr 30

Assets trafficked in Meta, TikTok and YouTube



In market3 - May 14

Flight live



In market17 - May 18

First performance read, cut by cut



How to review



Three steps. About 40 minutes.



Watch on your phone

Open the link on a phone with sound off. That's how 80 percent of views will happen.

Check the two claims

Confirm both claims match the wording your counsel approved on April 2.

Sign, or send one list

Sign below, or send Wren one consolidated list of changes by April 15.

Sign by Thursday, April 15



Signed: assets traffic April 26 and go live May 3. Not signed: the flight moves one working day per day of delay.



Prepared by



Wren Talavera Creative Director, Vermilion Works

Sedona, AZ wren@vermilionworks.com

For sign-off by



Holly Nakai VP Brand, Solvane Sun Care

Questions go to Wren, same day.

Sign here
En approuvant ce document, vous le signez électroniquement.

Sign off round 2

By signing, you approve all 14 cuts, 22 statics and final copy as shown in round 2 for the Summer 2027 flight starting May 3, 2027. Later changes to fixed items are a new round at $4,850. Fees and media budget are unchanged.